Takeoff service, without the wait

Still done for you. Just in hours, not days.

Upload the plan set and the AI does the takeoff — traced on the plan, material list on your SKUs — typically in 2–6 hours. You check it instead of counting it. And your first set, we run with you on a call.

Same deliverable a service sends back — PDF, CSV/XLSX, marked-up plans — with every number traced to the plan

One deliverable.
Ready to bid or order.

PDFmarked-up drawings showing every counted element
CSV / XLSXmaterial list, broken out by trade
Assembliesbreakdowns included where applicable
Traceableevery number tied to the line on the plan it came from
Takeoff service vs Aximos

Everything a service gives you, back in hours.

Takeoff serviceAximos
Who does the countingTheir estimatorThe AI — you check the draft
Time to a takeoffDays, in someone else’s queueHours, not days — typically 2–6 hours for the draft
CostPaid per job, at service ratesA project fee by plan-set size, shown before the AI runs
Plan changesSend it back and wait againAdjust the trace; the totals follow
Checking a numberYou get the list, not the reasonsEvery number ties to its line on the plan
Your standardsTheir assumptions and product namesYour catalog, stock lengths and rules

How it works

Upload the plans.A framing plan or the full permit set — no one to send it to.

Carport addition · Permit set20 pages

Scale set on 6 sheets
  • OPENED1/4" = 1'-0"

    14A101 · Floor 01 Plan

  • 1/4" = 1'-0"

    15A102 · Roof Plan

  • 16A201 · Exterior Elevations

  • 3/4" = 1'-0"

    18A310 · Wall Sections

  • 1/4" = 1'-0"

    5S200 · Foundation & Framing

  • 1/4" = 1'-0"

    6S210 · Ceiling Framing

  • 1/4" = 1'-0"

    7S220 · Roof Framing

  • 9S300 · Sections & Details

The AI drafts the takeoff.Traced on the plan and counted by layer, with your catalog and rules applied.

Layers

Main Floor · A218

  • Exterior WallsLinear121'7" LF
  • Interior WallsLinear206'0" LF
  • Headers — MainHeaders16 EA · 68'1"
  • Garage Separation WallLinear44'0" LF
  • FloorArea1,973 SF
  • Foundation · A123
  • Roof · A317
  • Floor System · A13
FoundationMainRoofA2Main floor

You check the draft.Review it layer by layer instead of counting it from scratch.

Roof framing · 5 layers traced
Review resultsWalkList
4 of 22 reviewed

Needs your attention (3)

  • !Skylight opening — skewed flat rafters not traced yet
  • !Chimney opening at B228 — no header traced
  • !Ridge beam B304 changes size along its run (A–D)

Roof framing

  • 2x12 Rafters · 92 EA
  • 2x8 Rafters · 42 EA
  • 2x10 Rafters · 50 EA
  • 2x12 Rafters · 20 EA
  • 11 7/8" LVL Beam · 6 EANo stock length

Send the list.A material list and marked-up drawings, out to Excel or CSV.

Material List 1· 3 sheets · 131 rows

ApprovedExport
MaterialLayerUnitQtyWasteTotal

Level 1 · Framing — Main

2x6x104 5/8 in Pre-Cut StudExterior WallsEA9410%103
2x6x16 Framing LumberExterior WallsEA2210%24
CDX Ply 4x8 1/2Exterior WallsEA2910%32
2x6x8 Framing LumberHeaders · 6in wallEA7610%83
2x12x10 Framing LumberFloor JoistsEA2610%29
2x12x14 Framing LumberFloor JoistsEA1410%16

Roof

2x8x14 Framing LumberRafters (4:12)EA3010%33
OSB 4x8 - 1/2RoofEA4212%47
Takeoff examples

See the actual work.

FAQ

Questions from people who were looking for a takeoff service

Is Aximos a takeoff service?

Not a queue you send plans into. The AI does the takeoff for you — typically 2–6 hours — and you check it against the plan before it goes out. For your first set, we run it together on a call, so you see the draft against your own drawings.

I don't have anyone to do takeoffs. Does this still help?

That's who it's for. The AI drafts the takeoff and the material list; checking a draft takes a fraction of the time counting does, and we walk your first one with you.

How is it different from outsourcing the takeoff?

A service hands you a finished list and its own assumptions. With Aximos the draft is yours: every number ties back to the line on the plan it came from, it follows your catalog, stock lengths and estimating rules, and when the plans change you adjust the trace instead of sending the job back.

How long does it take?

Typically 2–6 hours for the draft and material list, and never more than a day. Larger or more complex plan sets take longer — and there's no queue, so the clock starts when you upload.

What does it cost?

A subscription covers the workspace, and AI takeoff adds a fee per project based on the size of the plan set — you see it before the AI runs. Tracing by hand has no project fee. See the Pricing page, or book a demo and we'll price your projects.

What do I get out of it?

A material list broken out by layer and trade, exported to Excel or CSV, and the plans marked up so every counted element is traceable. Assemblies are included where you've set them up.

Which trades does it take off?

Framing is the core — walls, studs, plates, sheathing, headers, beams, joists and rafters, and window and door openings — counted off your plans.

Can I see it on my own plans?

Yes. Book a demo and we'll run Aximos on one of your plan sets with you, so you can check the draft against the drawings yourself.

Your next takeoff, back in hours.

Bring a plan set. We’ll run the first one with you on a call, and you check the draft against your own drawings.