A contractor checking a plan set on his pickup tailgate while his crew raises a wall at sunset
For framing contractors & builders

Get your framing number in before the bid closes.

Get a checkable first draft of the framing takeoff in hours. Aximos traces the plans and builds the material list, and the takeoff stays in your hands.

From the plans in your inbox to the lumber order on the truck.

When the plans land

Start from a draft, not a blank sheet

  • Upload the whole set

    Every sheet is calibrated from its printed scale.

  • The AI traces the framing

    Walls, headers, joists and rafters, in one run.

  • A draft in hours

    Typically 2–6 hours from upload to material list.

  • No outside queue

    The takeoff stays with you, not on someone else’s desk.

A plan set spread on a pickup tailgate with a tape measure and coffee, a job site behind
At your desk

Check it before it goes in your bid

  • Click any number

    See the lines it came from on the plan.

  • See what was assumed

    Plate heights and header notes cite the sheet.

  • Checks flag the gaps

    Openings with no header come up first.

  • Trace any part yourself

    Take over by hand in the same workspace.

A contractor at his desk at dusk reviewing a floor plan on a laptop, his hard hat on the chair
On the order

Order what the plans call for

  • By stock length

    Framing lumber comes out in the lengths you buy.

  • Your waste rules

    Applied to every line of every draft.

  • Send it to your yard

    Export to Excel or CSV and get it priced.

  • Back up your bid

    Every quantity traces to the plan if the GC asks.

A flatbed truck delivering framing lumber beside a fresh foundation at sunrise
Numbers you can defend

Measured, calculated, or read from the plans

  • 01

    Measured

    Wall lengths and areas, taken from each sheet’s printed scale.

  • 02

    Calculated

    Studs, plates and headers from your spacing, corner and waste rules.

  • 03

    Read from the plans

    Plate heights, header notes and sheathing, pulled from the legend and sections.

Compare

Three ways to get the takeoff done

Counting it yourselfOutsourced takeoffAximos
TurnaroundNights and weekendsDaysHours
Who does the countingYouA freelancerThe AI, you check
Where the numbers come fromYour own countA file comes backEvery number links to its trace
Fixing a mistakeRecount itSend it back and waitFix the line, the list updates
FAQ

Questions from contractors

Do I have to change how I estimate?

No. Save your stud spacing, corner, waste and stock-length rules, and every draft follows them.

Can I send the list to my lumber yard?

Yes. Export the approved list to Excel or CSV and send it to your supplier for pricing.

What does it take off?

Aximos is built for lumber and framing: walls, plates, headers, joists, rafters and sheathing.

Send us a set you’re bidding.

Book a call and we’ll run a takeoff on one of your current jobs, then walk you through checking it.